PORTLAND METRO & SW WASHINGTON
VERIFIED OUTCOMES · DOCUMENTED PERFORMANCE

Real Facilities.
Measurable Results.

See how Portland medical directors, plant managers, school principals, and property executives solved their toughest facility challenges with PEAK.

MEDICAL & HEALTHCARE

Outpatient Surgical & Orthopedic Clinic (Beaverton, OR)

99.4% QA Score · 14 RLU Avg ATP Reading
18,000 sq ft · 6x / Week Terminal Clean
1. The Problem

Their previous janitorial vendor was using standard commercial cleaners without enforcing chemical dwell times, resulting in failed internal surface swabs and dusty surgical recovery bays.

2. What PEAK Did

PEAK implemented a dedicated 4-color microfiber isolation system, EPA List N sporicidal chemistry, nightly physical QR closet check-ins, and weekly ATP bioluminescence meter verification.

3. Documented Result

Passed unannounced state accreditation inspection with zero environmental findings and maintained a 99.4% QA inspection average across 12 consecutive months.

MANUFACTURING & INDUSTRIAL

Precision Aerospace & Component Plant (Hillsboro, OR)

0 Safety Incidents · 100% Shift Attendance
42,000 sq ft · 5x / Week Shift-Aligned
1. The Problem

Operating across three continuous shifts, the plant suffered from greasy walk-ways, overflowing breakrooms between shift changes, and cleaners blocking active forklift lanes.

2. What PEAK Did

PEAK deployed a PPE-certified industrial team scheduled strictly during 2nd-to-3rd shift transitions, utilizing heavy-duty walk-behind scrubbers, ISSA 4,500 sq ft/hr workload planning, and maintaining full on-site SDS documentation.

3. Documented Result

Eliminated slip-and-fall floor hazards, achieved 100% shift attendance over 260 scheduled shifts, and boosted employee breakroom satisfaction scores by 64%.

EDUCATION & SCHOOLS

Private K-8 Academy Campus (Portland, OR)

38% Reduction in Seasonal Absenteeism
28,500 sq ft · 5x / Week After-Hours
1. The Problem

High winter flu and viral outbreaks were driving student and faculty absenteeism, while parents raised concerns about harsh bleach odors lingering in morning classrooms.

2. What PEAK Did

PEAK introduced our Healthy Classroom protocol using green-certified, zero-VOC hospital-grade disinfectants on all student desks, fountains, and restrooms with 100% background-checked staff.

3. Documented Result

Reduced winter illness-related classroom absences by 38% year-over-year while eliminating chemical odor complaints.

PROPERTY MANAGEMENT

4-Building Class A Office Portfolio (Lake Oswego & Tigard, OR)

98.8% QA Score · Zero Janitorial Tenant Churn
85,000 sq ft · Nightly + Day Porter
1. The Problem

The Senior Portfolio Manager was spending 6+ hours every week fielding tenant complaints about unstocked restrooms, smudged lobby glass, and slow move-out turnovers.

2. What PEAK Did

PEAK consolidated all 4 buildings under one dedicated Operations Lead, installed QR verification tokens in every janitorial closet, and automated monthly owner-facing QA reports.

3. Documented Result

Cut property manager janitorial oversight time to zero, completed 14 rapid tenant-ready suite turnovers on 24-hour notice, and achieved a 5-year high in lease renewals.